Bill of Quantities

MyPMP
QMS Template
ItemCategoryQtyUnit costAmount
Total0

Assumptions & notes

Part of My QMS β€” the MyPMP Quality Management System. Template MYPMP-TMPLT-0073 Β· Β© MyPMP β€” mypmp.in. QMS content copyright MyPMP.

Auto-saved in your browser Β· β˜… members can white-label & sync across devices

About the Bill of Quantities template

A Bill of Quantities (BoQ) is an itemised schedule of the measured works, materials, and labour required for a construction project, prepared from drawings and specifications. It gives every tendering contractor a common basis to price against, so bids can be compared like-for-like, and it later supports valuations, variations, and interim payments.

It's part of My QMS, MyPMP's Quality Management System: fill it in online, personalize it with your name and logo, then export a clean, branded PDF. Your work auto-saves in your browser.

When to use a Bill of Quantities

  • β–ΈIssuing tender documents so contractors price identical scope
  • β–ΈPreparing a firm or approximate cost estimate before construction
  • β–ΈValuing interim payments and measuring progress against completed items
  • β–ΈAssessing and pricing variations or change orders during the works

What a good Bill of Quantities includes

  • βœ“Item reference number and clear work description
  • βœ“Unit of measurement (m, mΒ², mΒ³, nr, tonne, sum)
  • βœ“Quantity measured from drawings, with method of measurement noted (e.g. NRM2 or SMM7)
  • βœ“Rate per unit and extended amount (quantity Γ— rate)
  • βœ“Section or trade breakdown with subtotals (preliminaries, substructure, etc.)
  • βœ“Provisional sums, prime cost sums, and contingency allowances

What's inside this template

The interactive form above gives you:

A table of Item, Category, Qty, Unit cost, AmountAssumptions & notes

Tips & common mistakes

  • πŸ’‘State the measurement standard used so contractors price on a consistent basis and disputes over quantities are reduced
  • πŸ’‘Keep preliminaries and provisional sums separate from measured works, don't bury them in item rates
  • πŸ’‘Double-check units against drawings, a mΒ² entered as m distorts the whole tender comparison

How it works

  1. 1. Fill it in β€” type directly into the fields, tables and sections above.
  2. 2. Brand it β€” add your organization name and logo with the Branding button.
  3. 3. Export β€” print to PDF, or become a member to white-label and sync across devices.

FAQ

What is a Bill of Quantities?οΌ‹

It is a detailed, itemised list of the materials, labour, and works needed for a project, each with a quantity, unit, and rate. It lets contractors submit comparable priced tenders and forms the basis for later valuations.

What is the difference between a firm and an approximate Bill of Quantities?οΌ‹

A firm BoQ is measured from complete drawings and is used for tendering a fixed scope, while an approximate BoQ is based on incomplete design and re-measured on site as the work is built.

Who prepares the Bill of Quantities?οΌ‹

It is usually produced by a quantity surveyor or cost consultant working from the architect's and engineer's drawings and specifications, before tenders are invited.

Make it yours β€” $9/mo or $99/yr

Membership unlocks white-label export (remove the MyPMP footer), cloud sync across devices, plus all apps & ScheduleX.

See membership
Bill of Quantities Template β€” Free & Interactive | MyPMP Β· MyPMP